The Swallows

Bathroom refurbishment completed for our client in time for Xmas. Upon stripping the old wall tiles, the render beneath had perished and had to be removed. We dry lined these walls and re-plastered the ceiling before laying new wall and floor tiles. The existing chinaware have been salvaged and re-used. The shower parts have been replace with new. Replacement of the old radiator with a new chrome towel rail, new cupboards and a custom made bath panel completed the job.  

Print | Sitemap
© Tony Morris and Sons (Developments) Ltd